Last Week(s)

Gym_SIPs

K-8 Schoolhouse:

  • Roof framing and “dry-in” achieved.
  • Air handling system (including ERV, “Energy Recovery Ventilation”*) installed.

Gym: Wall framing, with installation of structural insulated panels (SIPs), completed. Check out the super-insulated panels above.

Dorm: Drywall taped and finished.

Share on FacebookTweet about this on TwitterEmail this to someone