Welcome to the ACS Blog

This Week in Woody Creek

June 26, 2015 ACS_Central Area_062415

Each week, we ask ourselves: Can it get any better? And then it does. Again. The new schoolhouse and gym/community hall continue to surprise us with their beauty, ingenuity and energy efficiency. Enjoy these shots and check out all the photos here.

Last Week(s)

February 13, 2015 Gym_SIPs

K-8 Schoolhouse: Roof framing and “dry-in” achieved. Air handling system (including ERV, “Energy Recovery Ventilation”*) installed. Gym: Wall framing, with installation of structural insulated panels (SIPs), completed. Check out the super-insulated panels above. Dorm: Drywall taped and finished.

This Week

February 13, 2015 K8_MEP

K-8 Schoolhouse: MEP installations (mechanical, electrical and plumbing). See above. Finalization of FF&E (furnishings, fixtures and equipment) selection. Dorm: Interior painting. Gym: Installation of roof SIPs. Campus: Water farm excavation and installation in progress.